-
Vietnam Manufacturing Project: JINHUA LANHAI's "Made in Vietnam" project, aiming to produce products in Vietnam.
-
Advantages of Made in Vietnam:
- 17 years of production experience, a professional production management team, and a stable supply chain.
- A 60-person R&D team, with core product hardware and software independently developed by Lanhai.
- A major local taxpayer with a healthy capital chain.
- Guarantee of delivery time and product quality for Vietnam-manufactured products.
- Cost control, ensuring your interests by continuously improving the supply chain.
- Convenient transportation, with the factory being only one hour away from the nearest port and airport.
-
Vietnam Factory Information:
- Located in Hai Duong BW Industrial Park, close to Haiphong Port (VNHPH) and Noibai International Airport (HAN).
- Travel routes to the factory include flights from Shanghai and Shenzhen airports to Noibai International Airport, followed by a 2-hour drive to the factory.
- Transportation routes for products or materials include sea transport from Ningbo Port to Haiphong Port, followed by a 2-hour car ride to the factory, and a 10-day land transport from Guangxi Province.
-
How to Achieve Made in Vietnam:
- After receiving your order, the early communication stage determines product appearance, structure, electronic design, etc.
- Sample-making stage includes CNC machining and mold opening.
- Small batch trial, with core components shipped from China to Vietnam.
- Product assembly and shipping.
-
Details of the Vietnam Factory:
- Factory floor space of approximately 2,000 square meters, with over 80 employees, and a monthly capacity of 10,000 units expected in 2024.
-
Live Pictures of the Vietnam Factory: Includes images of Hai Duong BW Industrial Park, YUEHAI's exterior and interior, offices, finance office, meeting room, production workshop, incoming inspection area, packaging area, dressing room, IQC room, cold storage, laboratory, testing room, machine repair room, and the surrounding environment.
-
Differences from Made in China:
- Production process: China can achieve almost all processes, while Vietnam cannot achieve some processes such as metal processing and skin pasting.
- Cost: China's cost is 100%, Vietnam's cost is rising to 108% - 110% (material costs, equipment costs, etc.).
- Transportation cost: Sea and air transportation costs are almost the same, but DHL express cost has increased by 150%.
-
Progress Schedule:
- Decoration process is expected to be almost completed by May 10, 2024.
- Installation and commissioning of tooling equipment from May 22, 2024, to May 30, 2024.
- Trial production from June 5, 2024, to June 15, 2024.
-
About Certificate of Origin:
- To obtain the certificate of origin smoothly, Lanhai and Yuehai need to perform specific tasks, ensuring that the Vietnamese manufacturing part exceeds 35%.
Share: